Asbestos removal and demolition in 192 occupied apartments in sequence with other trades. ACM was found in texture ceiling, joint compound, flooring materials. Demolition of concrete slab including saw cutting, kitchen cabinets, doors and bathroom etc.
Construction waste management and recycling, Demolition and removal of selected portions of buildings and structures, Hazardous Material removal, and asbestos abatement. Removal of polychlorinated biphenyls (PCBs), DEHP-containing light fixture ballasts, mercury-containing light bulbs/tubes, mercury-containing thermostats and chlorofluorocarbons (CFCs) from Pasteur Hall. Removal and legal disposal of demolished materials off site… Asbestos removal of ALL ACMs from the site (Tile. Mastic, Pipe insulation, Tank insulation, Skim Coat, chalkboard, concrete walls, Transite, ceramic tile, joint compound etc..) , to accommodate the renovations of the basement, second, third and fourth floor of Pasteur Hall. LEAD Paint removal, containment, and disposal of lead-containing paint (LCP), building components coated with lead containing paint, and associated waste generated as a result of paint removal activities. And selective demolitions of walls and floors.
Selective demolition and hazardous materials removal, abatement and disposal of asbestos, lead paint and PCB/mercury. It also included is the removal and legal disposal of existing oil storage of the selective demolition & removal of existing floor, wall and limited ceiling systems and finishes, total removal of existing electrical, plumbing & mechanical systems. Renovation work consists of the addition and/or reinforcement of structural elements to meet current codes.
Renovation, New Construction, Carpentry, Siding and Window Installation , Framing, Drywall, Plaster, Floor restoration, and Final Construction Clean up.
Demolition of portions of the existing interior and exterior components of the existing building, site excavation, and constructing a new addition. Trades included Site work, Hazardous Material abatement, Concrete foundations, Installation of new elevator, wood framing,masonry (pavement, bricks, granite stairs), painting, plumbing, stone work, flooring, roofing, and ceiling. Installation of New HVAC System, Electrical. RSI completed the
renovation of first, second and 3rd floor of the existing structural and constructed a new
three-story addition successfully.
Renovation of the first two floors of building 12. Planning, shop drawings, Submittals Coordination, logistic, scheduling, interior lighting, Framing, HVAC, Electrical, Flooring (carpet, tiles,
and ceramic), Installation of exterior paver system and asphaltic repairs in 50,000 SF
parking lot, Plumbing, Painting, Carpentry, restoration of historical components,
partitions, brick walls, concrete stairs and Selective demolition of walls and ceiling,
sand blasting of Brick walls, and columns of a four-story mill-style office/industrial
building approximately 60,840 square feet gross originally built in 1865. Project was
completed on time and within budget.
Labor, Material, equipment & supervision required to complete the the rough carpentry, exterior siding and window installation.Hazardous Materials, Selective demolition, Asbestos abatement.
The building was occupied during renovation with resident relocation between units. Project required Occupied Renovation Safety Plan. All work was conducted in such a manner that all services to occupied units was restored by the end of each work day to allow regular evening occupancy and use by tenants.
Final Construction, Cleaning Concrete, Drywall Installation/Finishing, Roofing and Snow Removal